Search

  • Download Center
  • Blog
  • FAQ
TR

  • Solutions
  • Products
  • Software and Tools
  • Company
  • Contact
  • TR
    TREN
  • Power Distribution Solutions
  • MCC Withdrawable Switchgear Solutions
  • Inspection and Licencing Service
  • Low Voltage Enclosure Solutions
  • Stainless Steel Enclosure Solutions
  • Outdoor Enclosure Solutions
  • Data Center Solutions
  • Datacom-Network Solutions
  • EdgeBLOK Solutions
  • Seismic Solutions
  • Industries

Seismic Solutions For 
Low-Voltage Switchgear Systems

Seismic Solutions For
Data Center / EdgeBLOK

Heavy Industries

Infrastructures

Energy Plants

Public Buildings

Oil and Gas

Healthcare

Manufacturing Industries

Commercial Buildings

Petrochemical Refineries and Chemical Production

Metal and Mining 

Steel and Cement

Nuclear Power

Data Centers

Water Treatment

Large-Scale Residential Buildings

Automotive

MCC Withdrawable Switchgear Solutions

Withdrawable low voltage panel systems are a reliable and flexible solution designed to ensure energy continuity, especially in panel applications known as Motor Control Centers (MCC). With drawers that can be quickly replaced in case of a fault, your operations continue without interruption, maintenance time is reduced, and overall efficiency is increased.

Inspection and Licencing Service

Inspection and Licencing Service

There is no inspection and licensing obligation in the IEC 61439-1/2 standard. Inspection and licensing are a special service conducted by EAE Electrotechnics to eliminate the dissatisfaction among customers and employers caused by many original manufacturers and final assembly manufacturers (panel builders) operating in the low-voltage switchgear and controlgear assembly market failing to fulfill their responsibilities under the standard.

Low-Voltage Enclosure Solutions

Low-Voltage Enclosure Solutions

We offer comprehensive, user-friendly, and highly reliable enclosure solutions for all diverse needs of control and process applications, developed to international quality standards.

Stainless Steel Enclosure Solutions

We offer reliable, aesthetic, user-friendly, and comprehensive stainless enclosures, designed for both indoor and outdoor applications where corrosion resistance is crucial and hygiene conditions must be met. These include food processing, ports, water treatment plants, swimming pools, tunnels, fertilizer facilities, and many more, providing material quality and customization options required for specific environmental conditions.

Outdoor Enclosure Solutions

Our reliable outdoor enclosures are designed to provide maximum mechanical resistance and high corrosion protection through the UV-resistant paint process. These solutions are built for various sectors and applications, from power distribution to communication infrastructure, industrial automation, and renewable energy systems, enduring harsh outdoor environments and weather conditions. Our products ensure long life, safe use, and flexible as well as easy application.

Data Center Solutions

Rack cabinets and aisle containment solutions are among the most basic elements in the white space. equipment installation, security and an efficient air flow management is critically important. KabinPLUS data center solutions fully meets the need in this regard.

Datacom-Network Solutions

Uninterrupted connection and regular cabling are of great importance in data communication networks of offices, telecommunication infrastructures and industrial facilities. We support this need with our KabinPLUS KR and KM series products.

EdgeBLOK Solutions

The rapid development of industrial IoT and cloud-based applications is causing an increase in the daily IT network demand, thus creating the need for distributed and localized IT infrastructures. As KabinPLUS we provide micro datacenter, all-in-one containerized data center, and stand alone POD solutions.

EAE ELEKTROTEKNİK

Elektrik Pano ve Data Center uygulamalarında çözüm yaratan firmamız, güçlü Ar-Ge’si ile geliştirdiği geniş ürün gamı, standartlara tam uyumu, sürekli yenilikçilik arayışı ve her zaman üstün kalite ürün hedefi ile öne çıkıyor. Ayrıca, 1973 yılından beri pazarda söz sahibi olan EAE Grup firmalarının bir üyesi olarak, Türkiye’nin önde gelen kuruluşları arasında yer alıyor.

Power Distribution Solutions

Reliable, efficient, and uninterrupted power distribution is crucial to ensure smooth operations and keep costs under control. With our PanelMaster and E-Cabinet solutions, we elevate your facility's energy infrastructure to the highest level, offering comprehensive power distribution solutions tailored to your diverse needs.

  • PanelMaster

    Type Tested Switchgear Systems

  • E-Kabin

    Electrical Enclosures

  • KabinPLUS

    IT Infrastructure Solutions

PanelMaster
Type Tested Switchgear Systems

PanelMaster Withdrawable MCC 
Motor Control Switchgear Systems 

E-Kabin Electrical Enclosures

Floor-Standing Enclosures

  • S Series
  • D Series
  • L Series
  • HS Series (Outdoor - Modular)
  • HF Series (Outdoor - Monoblock)
  • XS Series (Stainless Steel - Modular)
  • XH Series (Stainless Steel - Monoblock)
  • Floor- Standing Enclosures Accessories 

Wall-Mounted Enclosures

  • O and M Series
  • HM Series (Outdoor)
  • XM Series (Stainless Steel)
  • E Series Distribution Boards
  • Wall-Mounted Enclosures Accessories

Terminal Boxes

  • T Series
  • XT Series (Stainless Steel)
  • Terminal Box Accessories

Consoles

  • K Series
  • Console Accessories

E-Kabin Type Tested Electrical Enclosures

KabinPLUS IT Infrastructure Solutions

Rack Cabinets

  • KD Series - Data Center Rack Cabinets
  • KL Series - Colocation Rack Cabinets
  • KS Series - Seismic Rack Cabinets
  • KR Series - Standing Type Datacom Rack Cabinets
  • KM Series - Wall-Mount Type Datacom Rack  Cabinets

EdgeBLOK

  • EdgeBLOK MDC - Micro Data Center
  • EdgeBLOK POD - Edge Computing POD
  • EdgeBLOK MOD - All In One Container

Cable Management

Airflow Management

Aisle Containment Solutions

  • Contact Details

Contact Details

Head Office

İkitelli Org. San. Bölg. Mah.
Eski Turgut Özal Cad. No:20/2
Başakşehir / İstanbul - Türkiye

+90 212 549 26 39

Factory

Organize Sanayi Bölgesi Mah.
14.Sokak İdari Bina (KJ Blok)
DL 2 Fabrika No:3/2
Dilovası / Kocaeli - Türkiye

+90 262 999 05 00
elektroteknik@eaegroup.com

Corporate
About Us
Information Society Services
Management Systems Policy
Human Resources Policy
Anti-Bribery and Anti-Corruption Policy
Career
Group Companies
Media Center
Corporate Identity
Blog
Download Center
FAQ
Protection of Personal Data
Clarification Text
PDPL Application Form
Policy on Protection, Processing of Personal Data and Confidentiality
Policy for Protection of Personal Data For Candidate Employees
  • KabinPro - Offer and Order Software
  • PanelMasterPro (PMPro) - Panel Design Software
  • PanelTemp - Temperature Rise Calculation Software
  • PMOdit - Low Voltage Switchgear Inspection Software
  • BIM - Building Information Modeling
  • Data Centers 3D Project Planning Service
  • Access To Your PanelMaster Inspection Reports

KabinPro - Offer and Order Software

KabinPro is a web-based offer and order management software specifically designed for our customer representatives and valued customers. Integrated with our CRM system, KabinPro automates the entire quote and order process from start to finish, saving your time and money. 

PanelMasterPro (PMPro) - Panel Design Software

PanelMasterPro is software specifically developed for our partners to facilitate and accelerate the design of PanelMaster type tested switchgears. Our software provides visual design capabilities and allows users to export Excel material lists, front views, and 2D AutoCAD manufacturing files.

PanelTemp - Temperature Rise Calculation Software

PanelTemp is an engineering software designed to simplify temperature rise calculations in low voltage switchgears, ensuring a quick and easy way to check design compliance in accordance with IEC standards. With this software, you can calculate the temperature rise of your switchgear up to 1600A as described by the standard, and work on fan calculations if needed. Additionally, you can obtain detailed reports of all calculations.

PMOdit - PanelMaster Low Voltage Switchgear Inspection Software

PMOdit is a comprehensive inspection and management software used for inspection processes of PanelMaster low voltage switchgears. This innovative solution is designed to optimize the inspection processes for supervisors, partners, and process stakeholders. The software provides end-to-end support to PanelMaster inspection teams in planning, control, and reporting processes.

BIM - KabinPLUS

BIM - PanelMaster

Data Centers 3D Project Planning Service

3D designs are very important in order to optimize the planning and design processes in data centers and to perform detailed analyses and to prevent any problems that may occur during implementation at the beginning of the project. At this point, KabinPLUS offers such project services professionally.

Access To Your PanelMaster Inspection Reports

PanelMaster Inspection Reports archive is a software that allows our partners to access the reports prepared by our teams using the PMOdit program after inspection of the fully installed switchgears, either via the QR code on the panel or with a username and password through KabinPro.

  • Solutions
    • Power Distribution Solutions
    • MCC Withdrawable Switchboard Solutions
    • Inspection and Licencing Service
    • Low-Voltage Enclosure Solutions
    • Stainless Steel Enclosure Solutions
    • Outdoor Enclosure Solutions
    • Data Center Solutions
    • Data-com Solutions
    • EdgeBLOK Solutions
    • Seismic Solutions
      • Seismic Solutions For Rack Cabinets / EdgeBLOKSeismic Solutions For Low-Voltage Switchboard Systems
    • Industries
      • Heavy Industries
      • Infrastructures
      • Energy Plants
      • Public Buildings
      • Oil and Gas
      • Healthcare
      • Commercial Buildings
      • Manufacturing Industries
      • Petrochemical Refineries and Chemical Production
      • Metal and Mining
      • Steel and Cement
      • Nuclear Power
      • Data Centers
      • Water Treatment
      • Large-Scale Residential Buildings
      • Automotive
  • Products
    • PanelMaster
      • Type-Tested Switchboard Systems
      • Withdrawable Motor Control Switchboard Systems
    • E-Kabin
      • E-Kabin - Electrical Enclosures
        • Floor-Standing Enclosures
          • S Series
          • D Series
          • L Series
          • HS Series
          • HF Series
          • XS Series
          • XH Series
          • Floor-Standing Enclosures Accessories
        • Wall Mounted Enclosures
          • O and M Series
          • HM Series
          • XM Series
          • E Series
          • Wall Mounted Enclosures Accessories
        • Terminal Boxes
          • T Series
          • XT Series
          • Terminal Box Accessories
        • Consoles
          • K Series
          • Console Accessories
      • E-Kabin - Type-Tested Electrical Enclosures
    • KabinPLUS
      • Rack Cabinets
        • KD Series - Data Center Rack Cabinets
        • KL Series - Colocation Rack Cabinets
        • KS Series - Seismic Rack Cabinets
        • KR Series - Standing Type Datacom Rack Cabinets
        • KM Series - Wall-Mount Type Datacom Rack  Cabinets
      • EdgeBLOK
        • EdgeBLOK MDC - Micro Data Center
        • EdgeBLOK POD - Edge Computing POD
        • EdgeBLOK MOD ​​- All In One Container
      • Cable Management
      • Airflow Management
      • Aisle Containment Solutions
  • Software and Tools
    • KabinPro - Offer and Order Software
    • PanelMasterPro (PMPro) - Panel Design SoftwarePanelTemp - Temperature Rise Calculation Software
    • PMOdit - Low-Voltage Switchgear Inspection Software
    • BIM - Information Building Modeling
    • Data Centers 3D Project Planning Service
    • Access to Your PanelMaster Inspection Reports
  • Company
    • About us
    • Information Society Services
    • Management Systems Policy
    • Human Resources Policy
    • Anti-Bribery and Anti-Corruption Policy
    • Career Opportunities
    • Group Companies
    • Corporate Identity
    • Blog
    • Download Center
    • FAQ
    • Clarification Text
    • PDPL Application Form
    • Personal Data Protection, Processing and Privacy Policy
    • Policy for Protection of Personal Data For Candidate Employees
  • Contact
  • TR TR Flag
    • TR TR Flag
    • ENUS Flag
  • Home
  • Software and Tools
null KabinPro - Offer and Order Softwarenull PanelMasterPro (PMPro) - Panel Design Softwarenull PanelTemp - Temperature Rise Calculation Softwarenull PMOdit - Low-Voltage Switchgear Inspection Software
  • null BIM - KabinPLUS
  • null BIM - PanelMaster
null Data Centers 3D Project Planning Servicenull Access to Your PanelMaster Inspection Reports

Software and Tools

Offer and Order Software

KabinPro - Offer and Order Software

Panel Design Software

PanelMasterPro (PMPro) - Panel Design Software

 PanelTemp - Temperature Rise Calculation Software

PanelTemp - Temperature Rise Calculation Software

PMOdit Low Voltage Switchboard Inspection Software

PMOdit - Low Voltage Switchgear Inspection Software

BIM - Building Information Modeling

BIM - Building Information Modeling

Data Centers 3D Project Planning Service

Data Centers 3D Project Planning Service

Access to Your PanelMaster Inspection Reports

Access to Your PanelMaster Inspection Reports

Contact us

Head Office

İkitelli Org. San. Bölg. Mah.
Eski Turgut Özal Cad. No:20/2
Başakşehir / İstanbul - Türkiye

+90 212 549 26 39

Factory

Organize Sanayi Bölgesi Mah.
14.Sokak İdari Bina (KJ Blok)
DL 2 Fabrika No:3/2
Dilovası / Kocaeli - Türkiye

+90 262 999 05 00
elektroteknik@eaegroup.com

Solutions

  • Power Distribution Solutions
  • MCC Withdrawable Switchgear Solutions
  • Inspection and Licencing Service
  • Low Voltage Enclosure Solutions
  • Stainless Steel Enclosure Solutions
  • Outdoor Enclosure Solutions
  • Data Center Solutions
  • Datacom-Network Solutions
  • EdgeBLOK Solutions
  • Seismic Solutions
  • Industries

Products

  • PanelMaster
  • E-Kabin
  • KabinPLUS

Software and Tools

  • KabinPro - Offer and Order Software
  • PanelMasterPro (PMPro) - Panel Design Software
  • PanelTemp - Temperature Rise Calculation Software
  • PMOdit - Low Voltage Switchgear Inspection Software
  • BIM - Building Information Modeling
  • Data Centers 3D Project Planning Service
  • Access To Your PanelMaster Inspection Reports

Company

  • About Us
  • Information Society Services
  • Management Systems Policy
  • Human Resources Policy
  • Anti-Bribery and Anti-Corruption Policy
  • Career
  • Group Companies
  • Corporate Identity
  • Blog
  • Download Center
  • FAQ
  • Clarification Text
  • PDPL Application Form
  • Policy on Protection, Processing of Personal Data and Confidentiality
  • Policy for Protection of Personal Data For Candidate Employees

Contact

  • Contact Details
  • Blog
Copyright EAE Elektroteknik San. Ve Tic. A.S. © 2025 All rights reserved. EAE Elektroteknik reserves the right to change the information contained on this site without notice.
Contact Us Downloads Blog LinkedIn Facebook Instagram YouTube

LPPD Text Explicit Consent

As in the capacity of the data controller/processor;

As in the capacity of the data controller/processor;

I hereby agree and represent that I grant my explicit consent that I have read and agreed on the Policy on Processing and Protection of the Personal Data and Confidentiality and Clarification Text of the Corporation delivered to me by EAE GROUP COMPANIES (‘‘hereinafter shall be referred to as “Company”), consisting of the corporations EAE ELEKTRİK ASANSÖR ENDÜSTİRİSİ İNŞAAT SAN. VE TİC. A.Ş., EAE ELEKTRİK AYDINLATMA ENDÜSTRİSİ SAN. VE TİC. A.Ş., EAE ELEKTROTEKNİK SAN. VE TİC. A.Ş., EAE TEKNOLOJİ ARAŞTIRMA GELİŞTİRME SAN. VE TİC. A.Ş., EAE MAKİNA SAN. VE TİC. A.Ş. and various personal data including but not limited to identification, contact information can be retained and stored directly or indirectly for a period stipulated by laws and/or required by the purpose of processing for the purpose of enabling the corporation to perform the sales/marketing of the products and services, provide after-sale services, perform campaigns, advertisement and various publicity activities for the products and services, provide surveys and feedbacks, perform supply, transportation service collaborations for the products and services and to execute the business operations and fulfill the agreements concluded with the customers, that it may be processed provided that it complies with the matters referred to in the laws and regulations; that it can be taken, recorded, stored in electronic or physical environments for the purpose of processing by taking the necessary security measures, that it may be reorganized, lawfully disclosed and transferred; that I have been informed on these matters by the Company and provided to be bound by the purposes stated hereinabove, that my personal data can be transferred by the Company to Company employees/officials, primarily corporation residing within the country such as EAE Elektrik, EAE Aydınlatma, EAE Electrotechnics, EAE Teknoloji, EAE Makina and group companies residing overseas such as EAE Germany, EAE America, EAE Australia, EAE Italy, EAE France and EAE UAE (Company and/or shareholders, partners thereof), public institutions and organizations, business partners, suppliers, dealers and/or service providers which the Company collaborates or works with for the execution of the services to be provided to me within the scope of the legal and statutory obligations and/or execution of the operations and activities and service provider residing overseas providing services within the scope of hosting (Microsoft Azure, AWS) and every other relevant activities and operations.